234.824 bytes |
Product Information |
Document ID: DDSE-42CSLR |
Netfinity 3000 - Completing the Installation
Applicable to: World-Wide
Completing the Installation
Notes |
Note |
4. Install the side cover:
a. Make sure that the cover lock (if present) is in the unlocked position.
b. Align the three bottom cover guides with the corresponding notches on the frame of the server.
c. Insert the bottom cover tab into the tab opening.
d. With one hand, align the top so that the cover rests against the server. With the other hand, press the cover at the bottom left corner, above the left rotated foot.
e. Keep the hand at the top to hold the cover in place. Use the thumb from the other hand to slide the cover forward, as shown in the following illustration. Make sure that the cover is latched into position.
5. If a cover lock is present, go to the back of the server and lock the cover.
You can use the cover lock and keys to secure the outside cover.
Attention |
Caution |
6. Reconnect the cables to the back of the server; then, plug the power cords into properly grounded electrical outlets.
7. If you have a modem or fax machine attached to the server, and you are not in the United Kingdom, reconnect the telephone line to the wall outlet and the server, and plug the power cords into properly grounded electrical outlets.
If you are in the United Kingdom, plug in the power cords first; then, connect the telephone line to the wall outlet and the server.
8. Power-on the server and all attached devices.
Attention |
When you have completed installing the covers and cables, go to "Updating the Server Configuration".
Search Keywords |
| |
Document Category |
Configuration | |
Date Created |
18-11-98 | |
Last Updated |
21-05-99 | |
Revision Date |
12-04-2000 | |
Brand |
IBM PC Server | |
Product Family |
Netfinity 3000 | |
Machine Type |
8476 | |
Model |
ALL | |
TypeModel |
| |
Retain Tip (if applicable) |
| |
Reverse Doclinks |