1.887 bytes

Service Hints & Tips

Document ID: MCGN-3MPK2A

Vinca StandbyServer - How long does it take to switch over from the primary server to the standby server?

Applicable to: World-Wide

Question:
How long does switching over take?

Answer:
It takes about 1.5 to 2 minutes to switch from the primary machine to the standby machine in the LAN Server Advanced environment. For non-LAN Server Advanced systems, it depends on how long critical applications (e.g. Notes, DB2/2) take to load.

Search Keywords

Hint Category

NetWare, OS/2, Windows NT

Date Created

09-10-97

Last Updated

22-09-98

Revision Date

21-09-99

Brand

IBM PC Server

Product Family

Clustering

Machine Type

Various

Model

Various

TypeModel

Retain Tip (if applicable)

Reverse Doclinks
and Admin Purposes