1.887 bytes |
Service Hints & Tips |
Document ID: MCGN-3MPK2A |
Vinca StandbyServer - How long does it take to switch over from the primary server to the standby server?
Applicable to: World-Wide
Question:
How long does switching over take?
Answer:
It takes about 1.5 to 2 minutes to switch from the primary machine to the standby machine in the LAN Server Advanced environment. For non-LAN Server Advanced systems, it depends on how long critical applications (e.g. Notes, DB2/2) take to load.
Search Keywords |
| |
Hint Category |
NetWare, OS/2, Windows NT | |
Date Created |
09-10-97 | |
Last Updated |
22-09-98 | |
Revision Date |
21-09-99 | |
Brand |
IBM PC Server | |
Product Family |
Clustering | |
Machine Type |
Various | |
Model |
Various | |
TypeModel |
| |
Retain Tip (if applicable) |
| |
Reverse Doclinks |